HEAVY HIGHWAY CONSTRUCTION

U.S. 51 / HICKORY
STREET

Rebuilding a flood-prone Du Quoin corridor with stronger pavement, expanded drainage and safer pedestrian access.
Location
Du Quoin, Illinois
Division
Heavy Highway Construction
Size
Approx. 4,000 Feet / 0.75 Mile
Completion
May 2026

Project Overview

For decades, the U.S. 51/Hickory Street corridor through Du Quoin faced recurring flooding, deteriorating pavement and costly pothole damage. Limited stormwater capacity allowed water to collect on the roadway during heavy rains, weakening the underlying pavement structure and creating ongoing problems for residents, businesses and motorists.

E.T. Simonds Construction completed a full reconstruction of the corridor between Park Street and Percy Street. The project rebuilt the roadway from the ground up, expanded stormwater infrastructure on both sides of U.S. 51 and added continuous sidewalks to create a stronger, safer and more accessible route through the community.

PROJECT SNAPSHOT
Reconstructed approximately 4,000 feet of U.S. 51
Rebuilt the roadway base and pavement structure
Expanded drainage infrastructure on both sides of the corridor
Corrected roadway grades to improve stormwater flow
Added new sidewalks along both sides of the project
Designed the completed roadway for a 40-50-year service life

BUILT TO SOLVE THE
PROBLEM AT ITS SOURCE

Our Approach

The complexity of the U.S. 51 reconstruction came from solving long-standing drainage and pavement issues while maintaining traffic through a vital Du Quoin corridor.
This project required more than another pavement overlay. Years of standing water had damaged the roadway from below, meaning a long-term solution had to address both the pavement and the drainage systems supporting it.
E.T. Simonds removed unstable soils, rebuilt the roadway base and installed new asphalt and concrete pavement. Larger storm sewers and box culverts were added along both sides of the corridor, while roadway grades were corrected to move stormwater away from the driving surface more effectively.
The project also incorporated utility improvements and new sidewalks along both sides of U.S. 51. Together, those improvements created a complete corridor designed to reduce future maintenance needs while improving everyday travel for drivers, pedestrians, residents and nearby businesses.
OUTCOME

The completed U.S. 51 reconstruction addresses the underlying causes of chronic flooding and pavement deterioration while giving Du Quoin a smoother, safer and more accessible transportation corridor.

Improved drainage helps keep stormwater off the roadway. A completely rebuilt pavement structure provides long-term durability. New sidewalks make it safer and easier to move through the corridor without a vehicle. Together, these improvements deliver lasting value for the residents, businesses and travelers who rely on U.S. 51 every day.
WHAT WE DELIVERED
Approximately 4,000 feet of roadway reconstructed
New drainage on both sides of the corridor
Continuous sidewalks along both sides of U.S. 51
$0 direct cost to Du Quoin taxpayers
40–50 year engineered roadway service life
“It’s something that needed to be done for a long time, and we’re proud to see it finally done, and done right.”
JOSH DOWNS
Mayor, City of Du Quoin

PRESS ROOM

Related press releases and news items regarding the I-57 corridor modernization.
LEARN MORE

EXPLORE MORE OF
E.T. SIMONDS WORK

See more projects, services, and company information across Southern Illinois.
EXPLORE PROJECTSEXPLORE PROJECTS
Copyright AlterEgo Marketing | All Rights Reserved.
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram